C3 Central Campus - Zero Net Energy Development | DDP
Zero Net Energy Development

C3 Central Campus

A revolutionary retrofit and redevelopment project preserving Central High School as a Zero-Net-Energy structure while adding a transformative 28-story commercial mix-use high-rise.

28

Story High-rise

300+

Tenant Spaces

3,500

Campus Population

Home Development C3 Central Campus

Project Overview

The C3 Central Campus represents a groundbreaking approach to sustainable urban development, combining historical preservation with cutting-edge renewable energy technology.

Preserving History, Building the Future

As part of the deconstruction, retrofit, and redevelopment of this property, Central High School will be preserved and retrofitted to become a structure that can produce as much renewable energy as it uses on an annual basis, also known as a Zero-Net-Energy structure (ZNE).

The other three non-historical structures will be deconstructed for Donation Benefit, allowing property owners to maximize tax advantages while contributing to sustainable development practices.

A new 28-story ZNE commercial mix-use high-rise will be built on the campus, creating a modern urban environment that supports diverse community needs.

C3 Central Campus Rendering

Project Vision Video

Watch our comprehensive overview of the C3 Central Campus development and its transformative impact on the community.

Key Features

Innovative design meets sustainable technology to create a thriving mixed-use campus for the modern era.

🌱

Zero Net Energy

Both the retrofitted Central High School and the new 28-story tower will produce as much renewable energy as they consume annually, setting new standards for sustainable development.

🏛️

Historic Preservation

Central High School will be carefully preserved and retrofitted, maintaining its historical significance while incorporating modern sustainable technologies.

🏢

Mixed-Use Development

The campus will feature commercial, residential, business, and social service spaces, creating a complete community ecosystem.

👥

Community Integration

Designed to support 3,500 individuals across all age demographics, including emergency services and social support systems.

💡

Smart Technology

Integrated with cutting-edge building management systems and renewable energy infrastructure for optimal efficiency.

♻️

Sustainable Construction

Non-historical structures will be deconstructed through DDP's Donation Benefit Program, maximizing material reuse and tax advantages.

Project Specifications

Comprehensive development details showcasing the scale and scope of this transformative project.

28
Stories High-rise
300+
Tenant Spaces
3,500
Supported Individuals
100%
Renewable Energy
4
Building Structures
ZNE
Energy Classification

Project Gallery

Explore the comprehensive architectural vision through detailed renderings and design concepts.

C3 Central Campus - Main View

Main Campus View

Complete C3 Central Campus with 28-story tower and preserved Central High School

C3 Central Campus - Infrastructure

Infrastructure Planning

Transportation and infrastructure integration with surrounding community

C3 Central Campus - Future Vision

Future Vision

Long-term development vision and community transformation

C3 Central Campus - Aerial Perspective

Aerial Perspective

Bird's eye view showing the complete campus integration and surrounding area

C3 Central Campus - Street Level

Street Level View

Ground-level perspective showcasing pedestrian accessibility and urban integration

C3 Central Campus - High-Rise Detail

High-Rise Tower Detail

Detailed view of the 28-story Zero Net Energy commercial mixed-use tower

C3 Central Campus - Campus Integration

Campus Integration

Seamless integration between historic preservation and modern development

C3 Central Campus - Community Spaces

Community Spaces

Public areas and community gathering spaces throughout the campus

C3 Central Campus - Architectural Detail

Architectural Details

Close-up view of architectural features and design elements

C3 Central Campus - Landscape Design

Landscape Design

Comprehensive landscaping and outdoor space planning

C3 Central Campus - Night View

Evening Illumination

Night-time view showcasing architectural lighting and ambiance

Ready to Learn More?

Discover how the C3 Central Campus can transform your community through sustainable development and innovative design. Connect with our development team today.